The inspection and test plan for power transformer article provides you information about power transformer test and power transformer inspection in manufacturing shop. The draft Inspection and test plan provided as well. Download from above link.
You may need to review this sheet in conjunction of Third Party Inspection for Power Transformer article.
The IEC, NEC, NEMA, FDF, ISO ANSI, CI, IPCEA standard requirements normally are applied for inspection and test plan in manufacturing shop.
The witness of some inspection and test by third party inspector is mandatory and cannot be waived.
Some others must only monitored and fully witnessing are not necessary, for these thing, the inspection man-days etc. depends to the purchaser decision, some prefer stringent monitoring and even assign resident inspector in manufacturing shop and some others relay to quality control system of the manufacture and assign only few days for monitoring points.
These are some of inspection points which need to be witnessed, checked, monitored and reviewed by third party inspector in Power Transformer manufacture shop.