This page provides a sample inspection and test plan for pressure vessel which is used in manufacturing shop for inspection and testing.
You may also want to review pressure vessel inspection and pressure vessel inspection procedure/instruction articles. The ASME Code Section VIII Div. 1 or 2 requirements normally are applied for inspection and test plan in pressure vessel manufacturing shop. The witness of some inspection and test by third party inspector or authorized inspector is mandatory and cannot be waived.
The Pressure Vessel ITP is covered in the I4I Academy Source Inspector Course. The API 510 Pressure Vessel Inspector Course covers inspection and testing requirements after a pressure vessel is placed in service.
Some others can only monitored and fully witnessing are not necessary, for these items, the inspection man-days etc. depends to the purchaser decision, some prefer stringent monitoring and even assign resident inspector in pressure vessel manufacturing shop and some others relay to quality control system of the pressure vessel manufacture and assign only few days for monitoring points.
These are some of inspection points which need to be witnessed, checked monitored and reviewed by third party or ASME authorized inspector.
The ASME Training Course is 5 days video training course and available online and the student that successfully pass the exam, receive I4I academy certificate with 40 hours training credit.