This page provides a sample inspection and test plan for storage tank which is used in the manufacturing shop and site for inspection and testing purposes.
The I4I Academy API 653 aboveground storage tank inspector course discusses this inspection and test plan in the API 650 - Welded Tanks for Oil Storage section. As a general ITP subject, the I4I Academy API Source Inspector course addresses inspection and test plans.
You may also want to review storage tank inspection and storage tank inspection procedure/instruction article.
The API 650 for atmospheric above ground storage tank and API 620 for low pressure storage tank requirements normally are applied for inspection and test plan in manufacturing shop as well as site erection.
The witness of some inspection and test by third party inspector is mandatory and cannot be waived.
Some others must only monitored and fully witnessing is not necessary, for these items, the inspection man-days etc. depends to the purchaser decision, some prefer stringent monitoring and even assign resident inspector in manufacturing shop and some others relay to quality control system of the manufacture and assign only few days for monitoring points.
These are some of inspection points which need to be witnessed, checked monitored and reviewed by third party inspector in pressure vessel manufacture shop.